Hits

Saturday, October 18, 2014

Changi Airport T1 car park closed from Fri 17 Oct 2am till Tue 21 Oct 2am

ALL content used in this not-for-profit blog remain the property of their respective owners.
http://www.channelnewsasia.com/news/singapore/changi-airport-t1-car/1420472.html

The temporary closure of the open-air car park fronting Changi Airport's Terminal 1 (T1) kicked off with minimal fuss on Friday (Oct 17), with little sign of congestion or chaos.

The four-day temporary closure began at 2am on Friday and will last till 2am on Tuesday.

The updated road signs and lane markings are part of the dry-run of the relocation of T1's open-air car park in the last quarter of 2014, as part of the terminal’s redevelopment plans called Project Jewel, to allow more space for aviation facilities.

Drivers of private cars picking up arrivals at T1 will also need to detour to a new arrival pick-up point. There will be no change to departure drop-offs as well as taxi boarding and drop-offs.

A shuttle bus service between T1 and Terminal 2 (T2) will also supplement the existing Skytrain service for this period. Running daily at regular five-minute intervals, the T1 stop is located outside the Arrival Hall on Level 1 near Burger King. T2's stop is at the Departure Check-in Hall, on Level 2, Door 1.

No comments:

Post a Comment